Field execution // Nuclear constructionBruce Power MCR · Tiverton, ONnourhawa.com

Nour
Hawa

Series Lead · Unit 4 FCI Mechanical Engineer FOAK Execution

I get reactor work from paper to the field, with procedures, materials, tooling, crews and training ready before the critical path needs them. Next stop: U.S. new-build and SMR projects.

Portrait of Nour Hawa
B.Eng · McMasterTN visa eligible
01 // The reactor face

480 channels.
Zero shortcuts.

Channels installed000
Critical-path recovered96 HRS
Units supportedU3 · U4
Hover the face to read a channel →

Major Component Replacement removes and rebuilds every fuel channel in the reactor core. As Series Lead, I make sure each scope is ready to execute before it reaches the reactor face. (Illustration: progress is simulated.)

02 // Proof

On the record.
In print.

Two pieces of my field work were featured in The Point, Bruce Power's company magazine.

96HRS

Critical path recovered

I found execution efficiencies during pressure tube and bellows severing that took four days off a reactor refurbishment schedule.

Featured · The Point
1ST

First-of-a-kind execution

I led FMTS PA hole ream-and-tap, a first-of-a-kind scope, deploying new tooling and a new process on the reactor face.

Featured · The Point
4YRS

Combat Engineer

I served in the Canadian Armed Forces Primary Reserve. That's where I built discipline in safety, risk awareness and teamwork under pressure.

CAF Reserve · 2021–2025
03 // Why Nour

Your project.
My work package.

New reactors run into the same problems as refurbishment: first-of-a-kind scopes, crowded interfaces, and schedules with no slack. Here's what I bring to your team.

PKG-01Proven

Workface
readiness

Before crews show up, the CWPs and CITPs are written, constraints are cleared, and materials, tooling, labour and training are in place.

Unit 4 FCI transition to field
PKG-02Proven

Critical-path
ownership

I plan in short intervals, keep the field and the schedule aligned, and look for efficiencies that put days back on the plan.

−4 days, PT & bellows severing
PKG-03Proven

First-of-
a-kind

I take new tooling and procedures into the field safely and to quality requirements. Every new reactor design needs that.

FOAK FMTS PA ream-and-tap
PKG-04Proven

Interface
control

I'm the link between construction, engineering, tooling, quality and training. I catch problems before they turn into delays.

Series Lead, 200+ craft, MCR
PKG-05Proven

Safety &
discipline

I've worked in outages, cleanrooms and steam generators, always under nuclear safety and quality programs.

Outage lead · cleanroom CTI prep
PKG-06Ready

Cleared to
cross

I'm TN visa eligible, open to U.S. relocation, and hold Enhanced Reliability clearance and a Bruce Power Orange Badge.

Open to U.S. relocation
04 // Shift log

Outage floor
to series lead.

Four years, one site, and more responsibility on every shift. Tap an entry to expand it.

● ActiveAug 2025 — Now

Series Lead, MCR Unit 4

CANDU Energy Inc. (AtkinsRéalis) · Bruce Power · Co-Series Lead, Unit 3
  • Led Unit 4 Fuel Channel Installation readiness and critical-path execution, aligning procedures, materials, tooling, workforce and logistics to move scopes from planning into the field.
  • Recovered 4 days of critical-path schedule during pressure tube and bellows sever, recognized in Bruce Power's The Point.
  • Led first-of-a-kind FMTS PA hole ream-and-tap, deploying new tooling and process on the reactor face, separately recognized in The Point.
  • Coordinated 200+ trade personnel and led daily interfaces across construction, engineering, tooling, quality and training.
  • Scopes: Fuel Channel Installation, End Fitting Inspection & Repair, Pressure Tube Sever, Bellows Sever, Helicoil Inspection & Replacement.
+
Shift 04Oct 2024 — Aug 2025

Project Coordinator, MCR Unit 3

CANDU Energy Inc. (AtkinsRéalis) · Bruce Power
  • Coordinated daily fuel channel installation, aligning schedules, materials, craft and logistics to keep critical-path work moving.
  • Supported calandria tube / CTI and fuel channel component prep in controlled cleanroom conditions, enforcing handling, FME, quality and readiness requirements.
  • Linked field crews and leadership through shift turnovers, progress reporting and escalation of execution constraints.
+
Shift 03Apr — Jun 2024

Outage Field Team Lead

Intech International (contracted to BWXT) · Bruce Power
  • Supervised field crews performing nuclear outage maintenance and repair, emphasizing safe work, procedural adherence and efficient execution within outage windows.
  • Used IBM Maximo for work order management, materials procurement support and engineering change coordination.
+
Shift 02Aug 2023 — Apr 2024

Water Lancing / Visual Inspection Technician

Intech International (contracted to BWXT) · Bruce Power
  • Executed steam generator water lancing and visual inspections, documented component conditions and supported maintenance planning under nuclear safety and quality requirements.
+
Shift 01Nov 2021 — Dec 2025

Combat Engineer (Reserve)

Canadian Armed Forces · Primary Reserve (part-time)
  • Performed military engineering and field-support duties, building discipline in safety, risk awareness and teamwork under pressure.
+

Execute

  • Workface readiness
  • Critical-path mgmt
  • Short-interval planning
  • Schedule recovery

Coordinate

  • CWP & CITP development
  • Construction / eng interfaces
  • Materials, tools & labour
  • Engineering change coordination

Systems

  • Primavera P6
  • IBM Maximo
  • Microsoft Office
  • Technical drawings

Comply

  • QA / QC & procedure compliance
  • Foreign Material Exclusion
  • Nuclear safety culture
  • HU tools: stop, verify, escalate
B
B.Eng. Mech. Eng. & SocietyMcMaster · 2021 · Dean's Honour List
●
Orange BadgeBruce Power nuclear site access
ER
Enhanced ReliabilitySecurity clearance (Gov. of Canada)
TN
TN Visa EligibleOpen to U.S. relocation
05 // Contact
Buildinga reactor?Let's talk.

I'm looking for project management, field engineering, project engineering and construction management roles on U.S. operating fleets, refurbishments and new-build SMR projects.

Get in touch

Want tocontact me?

Leave me a message here and I'll get back to you soon.

BasedOntario, Canada
SeekingU.S. nuclear roles
ResponseUsually within 48 hrs
0 / 5000

// I read every message